Financial evaluation rules can be adjusted at the project level under Project Detail → Project Settings (project economy section).
Project Currency and Exchange Rate
- Company and project currency – By default, a project inherits the currency configured at the company level, which can be switched to another currency in project settings.
- Exchange rate – When the project currency differs from the company base currency, a conversion rate is specified so the system can convert cost and sale rates into the project currency.
Counting Timesheets
Both workspace settings (as a default for new projects) and individual project settings allow specifying which timesheets enter project economy:
- All timesheets – All logged timesheets (excluding declined entries) are counted into project costs and revenues.
- Verified only – Only timesheets approved through the verification workflow enter project economy.