Conditional visibility of project timesheets

When setting conditional visibility for project timesheet attributes, you can select other timesheet attributes positioned higher in the order, attributes of the corresponding project tasks, project attributes, or the following standard system data of the timesheets as the Condition attribute:

  • Timesheet source type: Condition the visibility based on the type of object the timesheet was logged against (e.g., whether the time was logged directly to a project or to a specific task).